01What is there
Teesside is a chemical and energy cluster instead of a refining one
Heat exchanger cleaning on Teesside is turnaround work on one of the largest process clusters in the UK, and it is a cluster in the middle of a substantial change. Some of the plant that defined the area has gone; a great deal of chemical, fertiliser, energy and terminal duty continues, and new carbon capture and hydrogen infrastructure is being built alongside it. What has not changed is that exchangers here come apart in a planned window and not otherwise.
- Wilton and Seal Sands
- Two large chemical parks with multiple operators sharing utilities and infrastructure. SABIC's Olefins 6 cracker at Wilton, offline since the end of 2020, was confirmed for permanent closure in 2025; the LDPE plant continues on feedstock brought in from elsewhere.
- Billingham
- CF Fertilisers closed its Billingham ammonia plant permanently, but the site continues to produce ammonium nitrate and nitric acid using imported ammonia. Those are still exchanger-heavy duties with their own fouling.
- Energy and terminals
- Power generation, energy from waste, biomass and tank terminal operations across the Tees, plus the Net Zero Teesside carbon capture and H2Teesside hydrogen projects under development.
- Shared utilities
- Much of the cluster takes steam, power and cooling water from shared systems, which means a shutdown affects more operators than the one taking it and windows are negotiated well in advance.